• Login
    Password
All challenges
      • TOU02: Monitoring consumption and translating it into pollution avoided on electrically connected platforms

          • For several weeks now, the electrical connection of ships at quay has been operational in the port of Toulon (cruise ships, ferries). The idea now is to monitor consumption and calculate and anticipate the carbon consumption avoided by ships.

          • What the challenge owner would like to develop over 48h
          • A tool for monitoring consumption and assessing pollution avoided
          • Which skills the challenge owner is looking for
          • Programming, engineering, data science and vizualisation
Campus mondial de la mer
Technopôle Brest-Iroise
525, Avenue Alexis de Rochon
29280 Plouzané
Contactez-nous
#allerloin
  • Brest Métropole
  • Région Bretagne
  • https://www.tech-brest-iroise.fr/
Lettre d'informations : Désinscription | Mailings : Désinscription
 
Mentions-légales | Plan du site | Powered by diasite
Designed by diateam