• Login
    Password
All challenges
      • LRO09 - Marina cleaner || le nettoyage de la marina de La Rochelle grâce à un barrage flottant

          • Employees of La Rochelle marina have to clean the various basins regularly because of the floating waste that accumulates there regularly. This waste comes from the ocean, when the gate (lock) of the trawler basin is opened.

            The aim is to find a system to block, direct and finally pick up waste at the lock when it opens. At each tide, day or night, the system must not interfere with the operation of the lock or the passage of boats.

            A floating dam with a net skirt could attach to the door and deploy with an arm when the lock is opened. The waste would be trapped and then with the current directed to an area dedicated to collection. The dam would re-wrap to the side at the full opening of the door.

            The waste would then be transported ashore by means of a conveyor.

            The difficulties of this project are:

            • The tensile force of the current at the opening
            • The hooking system on the lock
            • The design of the skirt dam
            • The winding system of the dam
            • The positioning of the conveyor and its operation
            • Salt air
            • The visual impact of the system.
          • What the challenge owner would like to develop over 48h
          • A digital tool
          • Which skills the challenge owner is looking for
          • Physical knowledge
Campus mondial de la mer
Technopôle Brest-Iroise
525, Avenue Alexis de Rochon
29280 Plouzané
Contactez-nous
#allerloin
  • Brest Métropole
  • Région Bretagne
  • https://www.tech-brest-iroise.fr/
Lettre d'informations : Désinscription | Mailings : Désinscription
 
Mentions-légales | Plan du site | Powered by diasite
Designed by diateam